Mapping: 7.2.4 Change Control


7.2.4 : Change Control

Requirement:


The asset owner shall have policies and procedures to authorize, validate and approve changes to the current configuration baseline and infrastructure drawings/documentation, including revision and patch levels.

Guidance:


Linked Article Note Edit
No linked articles available.